Technical document

· PDF

Tell us who you are and the document downloads straight away. We use these details only to follow up on your requirement.

Samples & documents

What can we send you?

Tick what you need
Request a quote
NUROIL / BITUMEN / PENETRATION GRADE / 200/300

Bitumen 200/300.For specialised uses.

Bitumen 200/300 is an extremely soft grade of penetration bitumen.

  • Penetration 200–300
  • Softening point 32 °C min
  • Flash point 177 °C min
  • ASTM D946
Black steel drums of penetration grade bitumen on a pallet
StandardASTM D946Softening point 32 °C min
200/300Pen 200–300Priming coats, curing seals and cold-condition work
HazardNot classifiedUN Not regulated cold · UN 3257 when shipped hot, per SDS
Penetration at 25 °C200–300 (0.1 mm)
Softening point32 °C min
Flash point177 °C min
Ductility at 25 °C100 cm min
StandardASTM D946, AASHTO M 20
Switch gradeThe penetration grades
Compare the penetration grades
01 THE GRADE

What is Bitumen 200/300?

Bitumen 200/300 is an extremely soft grade of penetration bitumen. Bitumen 200/300 is primarily used in specialised applications that demand extreme softness and flexibility, particularly in cold climates and certain industrial processes.

The main application of Bitumen 200/300 is in industrial and specialised uses rather than in standard road construction. This grade’s extreme softness and high flexibility make it suitable for applications that require a very pliable material.

Bitumen 200/300 is supplied to ASTM D946 (AASHTO M 20). ASTM D946 itself sets no softening-point limit; the minimum shown is the one stated on the grade's specification, tested to ASTM D36.

Share the grade, standard and edition your project names and our team will confirm the fit and the supply arrangement.

Identity
Standard
ASTM D946
Penetration
200–300 (0.1 mm)
Softening point
32 °C min
Penetration grade bitumen · ASTM D946
Why Bitumen 200/300
  • Both standards, the full rangeQuote against ASTM D946 or EN 12591 from one supplier, from hard 20/30 to soft 200/300, matched to the standard and edition in your project documents.
  • Every batch testedPenetration and softening point are tested on each batch against the specified standard before it ships, so the grade on the paperwork is the grade in the drum.
  • Full shipping documentationA Certificate of Analysis travels with every shipment. Certificate of Origin, MSDS and third-party inspection reports are arranged on request.
  • Three UAE load portsLoading from Jebel Ali, Port Khalid and Hamriyah gives flexibility on vessel timing and routing. FOB is standard; CFR and CIF are quoted on request.
  • Packed for your siteNew steel drums for containerised supply, jumbo bags for compatible grades, or heated bulk by vessel and tanker for receivers with hot storage.
  • Trade risk handledThe Nuroil team manages transport, insurance, logistics and foreign-currency payments, and can discuss financing options with overseas buyers.
What Nuroil does on every order

Why source Bitumen 200/300 from Nuroil?

  • Tested against your standard

    Penetration and softening point on every batch, reported on the Certificate of Analysis.

  • ASTM or EN, as specified

    Share the standard and edition your project names; closely related grades are not treated as interchangeable.

  • Drum to bulk

    New steel drums, jumbo bags, tanker vessel or tank container, matched to your receiving facilities.

  • FOB, CFR or CIF

    FOB Jebel Ali, Port Khalid or Hamriyah; CFR and CIF on request.

02 TECHNICAL DATA

Catalogue specification.

Penetration at 25 °C, 100 g, 5 s
200–300 (0.1 mm)ASTM D5
Softening point (ring and ball)
32 °C minASTM D36
Flash point, Cleveland open cup
177 °C minASTM D92
Ductility at 25 °C, 5 cm/min
100 cm minASTM D113
Solubility in trichloroethylene
99% wt minASTM D2042
Thin-film oven test (TFOT)
Residue conditioningASTM D1754
Retained penetration, after TFOT
37% minASTM D5
Loss on heating, after TFOT
1.5% wt maxASTM D6
Spot test
NegativeAASHTO T102
03 APPLICATIONS

Where it is used.

04 SAFETY & HANDLING

Not classified cold. Handled hot, with care.

Penetration grade bitumen is generally not classified as hazardous when cold. It is stored, pumped and loaded hot, and the Safety Data Sheet for the offered grade decides; review it before first handling.

Not classified
  • GHS Generally not classified as hazardous when cold. Check the SDS for the offered grade.
  • Hot product Handled hot: contact causes severe burns, and hydrogen sulphide can collect in tank headspace. Per SDS.
UN
Not regulated cold · UN 3257 when shipped hot, per SDS
Transport
Elevated temperature liquid, Class 9, when hot · per SDS
  1. 01
    Hot product burns

    Contact with hot bitumen causes severe burns. Wear heat-resistant gloves, face protection and covering clothing when handling it hot.

  2. 02
    Hydrogen sulphide in the headspace

    H₂S can collect in the headspace of heated tanks and tankers. Ventilate and test the atmosphere before opening or entry, per SDS.

  3. 03
    Avoid overheating

    Prolonged excessive heat accelerates ageing and hardening before application. Use the heating range appropriate to the grade.

  4. 04
    Follow the SDS

    Classification, first aid and fire-fighting measures are on the Safety Data Sheet for the offered grade.

Plan heating and handling.
Before it arrivesHeating and receiving confirmed

Confirm heating, storage and handling requirements for your grade and packing format before shipment arrives. Hot bulk bitumen requires suitable heated receiving facilities.

  • Grade temperatureUse the heating and application range appropriate to the selected grade.
  • Avoid overheatingProlonged excessive heat accelerates ageing and hardening before application.
  • Modifier compatibilityConfirm compatibility with project-required polymers or additives before site blending.
  • Receiving facilitiesHot bulk bitumen requires suitable heated storage, pumps and safe transfer equipment.
Standards and test methods.
  • HS code2713.20
  • Transport, coldNot regulated
  • Transport, hotUN 3257
ASTM D946 · AASHTO M 20
ASTM penetration-grade specification and its AASHTO equivalent
ASTM D5 / ASTM D36
Penetration and ring-and-ball softening point
ASTM D92 / D113 / D2042
Flash point, ductility and solubility
ASTM D1754 / ASTM D6
Thin-film oven residue and loss on heating
AASHTO T102
Spot test
National road authority specification
May reference a standard or national variant; confirm the exact standard, grade and edition before ordering
05 PACKING OPTIONS

Drums, jumbo bags or bulk.

Packing availability is confirmed for Bitumen 200/300 and the offered source. Container loads in the planner are typical planning figures; the offer confirms them.

Plan your order

How many containers is that?

Typical loads used for planning. Your offer confirms the exact packing and load for the product and source.

720 ft containers
drums
556
Last 20 ft container
94% full
  • Minimum orderBy grade and packingShare your requirement; feasibility is confirmed with the quote
  • BulkTanker vessel or tank containerPer vessel hold capacity, confirmed at booking
  • DocumentsCoA with every batchSDS and Certificate of Origin on request
06 BEFORE YOU ORDER

Frequently asked questions.

01What does 200/300 mean in a bitumen grade?

It means penetration between 200 and 300 tenths of a millimetre in the standard needle test at 25°C. Lower numbers indicate harder bitumen.

02Does a grade name establish product suitability?

No. Compare the complete offered specification with the project requirements and applicable standard.

03What packing formats are available?

Drums, jumbo bags and bulk supply are available depending on grade, quantity and destination facilities.

04What documents come with each shipment?

Every shipment includes a Certificate of Analysis. Certificate of Origin, MSDS and third-party inspection reports are available on request.

05What Incoterms do you offer?

FOB is commonly quoted from Jebel Ali, Port Khalid and Sharjah Hamriyah. CFR and CIF are available on request.

06How is the grade tested before shipment?

Each batch is tested for penetration and softening point against the specified standard, with results reported on the Certificate of Analysis.

FROM SPECIFICATION TO SUPPLY

Discuss your Bitumen 200/300 requirement.

Include the grade, ASTM or EN standard, quantity, destination, specification and packing preference. Our team replies with a tailored offer. We reply with a firm FOB, CFR or CIF offer, usually within 24 hours.

  • Grade plus standard, ASTM or EN
  • Drums, jumbo bags or bulk
  • FOB, CFR or CIF
Request a quote
FROM THE KNOWLEDGE CENTRE

Guides & articles

Written by our trade desk to help you specify, compare and buy with confidence.

All guides & articles
ArticleBitumen · 2 minHow to choose the right grade of bitumen

Based on a variety of criteria, bitumen is divided into distinct grades. The type of application, the climate, the amount of…

Read
ArticleBitumen · 2 minThe penetration test on bitumen

Bitumen is a product of crude oil distillation. It's a black, sticky and viscous material commonly used in road construction and…

Read
ArticleBitumen · 3 minHow bitumen choice affects road life in hot climates

Why hot-climate roads rut, bleed and age early, and how grading systems, binder stiffness and modification help a pavement last…

Read
GuideBitumen · 1 minBitumen applications

Bitumen is mostly utilised in the construction industry including waterproofing to construct roads, highways, and rail networks.

Read
GuideBitumen · 2 minBitumen standards

Petroleum bituminous binders quality is determined using a variety of Standards and Grading methods

Read
GuideBitumen · 2 minHow bitumen is produced

Of the wide variety of crude oils commercially available, only a limited number are considered suitable for producing bitumen of…

Read
LET’S TALK ABOUT YOUR REQUIREMENTS

Your next shipment starts here.

Request a quote