Technical document

· PDF

Tell us who you are and the document downloads straight away. We use these details only to follow up on your requirement.

Samples & documents

What can we send you?

Tick what you need
Request a quote
Guide3 min read7 sections

Knowledge centre · Waterproofing & construction

Rubberized bitumen coating specifications: what each parameter means

A guide to the values on a rubberized bitumen coating data sheet: solids, rubber content, density, elongation, drying time, VOC and ASTM D1227 class.

Written by the Nuroil trade desk, Sharjah

NURCOAT rubberized bitumen coating
On this page · 7 sections
  1. 01The standard behind the product
  2. 02Typical parameters
  3. 03Solids content
  4. 04Rubber content and elongation
  5. 05Drying time versus cure
  6. 06Other claims worth checking
  7. 07Using this in an enquiry

Rubberized bitumen coatings from different producers can look identical in the pail. The technical data sheet is where they differ. This guide explains the parameters most often listed and what each tells a buyer or site engineer.

The standard behind the product

Many regional rubberized emulsion coatings state conformity with ASTM D1227, the specification for emulsified asphalt used as a protective coating. It classifies products by type and class:

  • Type refers to reinforcement. Type I contains fillers or fibres including asbestos, Type II contains non-asbestos fillers or fibres, and Type III contains no fibrous reinforcement.
  • Class refers to the emulsifier. Class 1 uses mineral colloid emulsifying agents; Class 2 uses chemical emulsifiers.

Rubberized coatings commonly claim Type III, Class 1. The standard covers tests such as residue by evaporation, ash content, water content, firm set, flexibility, water resistance and heat behaviour. Note that ASTM D1227 is written around emulsified asphalt and does not itself set a rubber content, so rubber content is a separate claim to check.

Typical parameters

ParameterTypical published valuesWhat it tells you
Form and colourDark brown to black thixotropic liquidThixotropic products resist sagging on walls
DensityAbout 1.0 g/cm³Converts litres to kilograms for freight and coverage
Solids contentAbout 35 to 45 percentHow much film remains after the water evaporates
Rubber contentFrom about 3 percent up to over 10 percent of the dried filmFlexibility and crack-bridging ability
ElongationOver 300 percent on some productsHow far the dry film stretches before breaking
Drying timeAbout 1 to 2 hours in warm conditionsTime before recoating, not full cure
Application temperatureAbout 5 to 55 °CAmbient and material range for use
Service temperatureAbout -5 to 75 °CRange the cured film tolerates
VOCUnder 50 g/L on water-based productsSolvent emissions during application

Values vary by producer and grade, and data sheets often state a tolerance of 5 to 10 percent. Use the table to understand the parameters, not as a specification.

Solids content

Solids content is the share of the product that stays on the wall once water has evaporated. It is often measured by evaporation methods such as those in ASTM D2939. A coating with 40 percent solids leaves more film per litre than one with 35 percent at the same coverage rate. When comparing prices, compare cost per square metre at the required dry film thickness, not cost per drum.

Rubber content and elongation

Rubber improves flexibility, low-temperature behaviour and the ability to bridge fine shrinkage cracks. Data sheets express it differently: some give it as a percentage of the dried film, others of the wet product. Ask which basis is used. Elongation, often measured using rubber tensile methods such as ASTM D412, is a more direct indicator of how the film behaves when the substrate moves. A high-rubber grade is worth specifying where cracking is expected, for example at construction joints or on new blockwork.

Drying time versus cure

Drying time on a data sheet usually means the time until the coat can be handled or recoated under stated conditions. Full cure, when the film reaches its final properties, takes longer. Manufacturers often require around 48 hours before protection board or backfill is applied. Note the temperature at which the drying time was measured; laboratory figures at 23 °C and site figures at 35 °C are not directly comparable.

Other claims worth checking

  • Resistance to chlorides and sulphates, relevant in saline ground.
  • Freedom from asbestos, lead and similar substances, sometimes stated explicitly.
  • Green building listings based on low VOC content.
  • Shelf life, typically up to 12 months in proper storage.

Using this in an enquiry

State the standard you need the product to meet, the minimum solids and rubber content, and any elongation or VOC limit in your project specification. Ask for the technical data sheet, safety data sheet and a certificate of analysis tied to the batch number. Nuroil provides a CoA with every delivery and can arrange third-party inspection on request; send your specification via request a quote.

PRODUCTS IN THIS GUIDE
KEEP READING

More from the Knowledge Centre.

STILL HAVE A QUESTION?

Ask the people who trade it every day.

Our trade managers answer technical and commercial questions about grades, specifications, packing and shipping.

LET’S TALK ABOUT YOUR REQUIREMENTS

Your next shipment starts here.

Request a quote