Technical document

· PDF

Tell us who you are and the document downloads straight away. We use these details only to follow up on your requirement.

Samples & documents

What can we send you?

Tick what you need
Request a quote
Expert article3 min read6 sections

Knowledge centre · Industrial chemicals

Charging an ammonia refrigeration system: what to plan before the ammonia arrives

Planning the first charge or a top-up of an ammonia refrigeration system: preparation, receiving the delivery and the controls that prevent releases.

Written by the Nuroil trade desk, Sharjah

On this page · 6 sections
  1. 01Before charging: is the system ready?
  2. 02Receiving the delivery
  3. 03During charging
  4. 04People and protective equipment
  5. 05After charging
  6. 06Buying for a charge

Charging an ammonia refrigeration system, whether with its first full charge or a top-up, is one of the higher-risk routine tasks in a plant's life. Large volumes of liquid ammonia are transferred through temporary connections, and the quality of what goes in sets the condition of the system for years. This article explains what plant owners and buyers should plan before the ammonia arrives. It is not a procedure; the work itself must follow your written operating procedures and be carried out by trained, competent people.

Before charging: is the system ready?

A new or opened system must be tight, dry and free of air before ammonia goes in. Contractors typically pressure-test the system, then evacuate it to remove air and moisture. Skipping or shortening evacuation leaves water and non-condensable gas inside, and both cause long-term problems. Water lowers the suction pressure at which ammonia evaporates for a given temperature and can freeze in low-temperature parts, while air raises condensing pressure and power use.

  • Pressure test records complete and signed off.
  • Evacuation to the level specified by the system designer, with records.
  • Relief valves, gauges, level indicators and detection systems installed and working.
  • Written procedures for charging, including valve positions, stop points and emergency actions.

Receiving the delivery

Workplace safety guidance for ammonia receiving sets out several basic controls, which apply whether ammonia arrives in cylinders or by tanker:

  • Written standard operating procedures for loading the receiver or storage vessel, and staff trained on them.
  • Wheel chocks on any delivery vehicle during unloading.
  • A check of the vessel level gauge before starting, to confirm there is room.
  • Hoses designed for ammonia, properly connected, inspected and tested as part of a maintenance programme.
  • The transfer is never left unattended.
  • Hoses and lines emptied and vented through bleed valves before disconnection, with nobody standing in line with the vent.
  • Cylinders secured, and lines vented before they are disconnected.

During charging

Charging is usually done as liquid into a designated charging connection, often on the liquid line or into the high-pressure receiver, according to the system design. Industry procedures stress charging slowly to avoid thermal shock in cold components, watching levels and pressures continuously, and never trapping liquid between closed valves. Trapped liquid ammonia expands as it warms and can generate pressures high enough to rupture piping or hoses.

Overfilling is a common error. Too much ammonia in a receiver can back liquid up into condensers or reach compressors. Charge in stages, allow the system to stabilise, and compare levels with the designer's charge figures.

Charge slowly, watch levels, never trap liquid between valves, and never leave the transfer unattended.

People and protective equipment

Only trained staff should take part. PPE for connecting, disconnecting and venting typically includes eye and face protection and chemical-resistant gloves, with respiratory protection and emergency equipment available as the site risk assessment requires. Emergency showers and eyewash stations should be close by and tested. Ammonia's odour can be detected at low concentrations; anyone who smells it should move away and the source should be investigated. Refer to the SDS and your emergency action plan.

After charging

  • Check all temporary connections are closed, capped and leak-free.
  • Record the quantity charged and the lot numbers and certificates of the ammonia used.
  • Run the purger, if fitted, during initial operation to remove any remaining air.
  • Consider sampling ammonia from the system after start-up to establish a water baseline.

Buying for a charge

Tell your supplier the total charge required, the format your site can receive, the grade (refrigeration grade is the norm), and the timing relative to commissioning. Ask for a certificate of analysis that shows ammonia purity, water and oil content. Nuroil provides a CoA with every delivery and can arrange SDS and third-party inspection on request. Use our quote request form to plan supply around your commissioning date.

KEEP READING

More from the Knowledge Centre.

STILL HAVE A QUESTION?

Ask the people who trade it every day.

Our trade managers answer technical and commercial questions about grades, specifications, packing and shipping.

LET’S TALK ABOUT YOUR REQUIREMENTS

Your next shipment starts here.

Request a quote