Technical document

· PDF

Tell us who you are and the document downloads straight away. We use these details only to follow up on your requirement.

Samples & documents

What can we send you?

Tick what you need
Request a quote
Guide3 min read6 sections

Knowledge centre · Bitumen

Buying penetration grade bitumen: a checklist from grade to delivery

A step-by-step checklist for ordering 40/50, 60/70, 80/100 or 85/100 bitumen: grade and standard, packing, storage temperatures, sampling and documents.

Written by the Nuroil trade desk, Sharjah

Pencil sketch of a bitumen needle penetration test
On this page · 6 sections
  1. 011. Grade and standard
  2. 022. Packing
  3. 033. Storage on arrival
  4. 044. Sampling and inspection
  5. 055. Documents and terms
  6. 06Sending the enquiry

Ordering penetration grade bitumen looks simple: a grade, a quantity and a port. In practice most problems with a shipment trace back to something that was left out of the enquiry. This checklist sets out what to settle before an order is placed, grouped in the order a buyer usually works through it.

1. Grade and standard

  • Exact band. 80/100 and 85/100 are different requirements; so are 60/70 and 50/70. Copy the grade exactly from the project specification.
  • Standard and edition. ASTM D946, EN 12591, or a national specification. Limits on softening point, ductility and ageing differ between them.
  • Extra requirements. Some tenders add wax content, Fraass breaking point or viscosity limits. List them up front.
  • End use. Paving, surface dressing, emulsion manufacture or roofing. It helps the supplier confirm the grade is sensible.

2. Packing

Penetration grades move in steel drums, polypropylene bags or jumbo bags, and in bulk by heated tanker, bitumen vessel or insulated tank container. The choice depends on the receiving site.

PackingSuitsPoints to agree
Steel drumsSmall projects, remote sites, long inland transportNet weight per drum, drum condition, marking with grade and batch
BagsSites with melting equipment; lower packing cost than drumsBag weight, palletising, protection from heat in transit
BulkPlants with heated storage tanksDischarge temperature, tank cleanliness, heating on arrival

Marking matters for traceability. IS 73, for example, requires each container to show the manufacturer, month and year of manufacture, material and grade, and batch number. Ask for the same on any packed shipment.

3. Storage on arrival

Plan storage before the cargo lands. Eurobitume recommends that bulk bitumen is not allowed to go cold in the tank, and gives storage temperatures by grade. Its figures are shown below for the EN grades nearest the common penetration bands.

GradeStorage up to 1 monthStorage over 1 month
35/50125°C85°C
40/60 and 50/70120°C80°C
70/100115°C75°C
100/150115°C70°C

When raising the temperature after a shutdown, the same guidance advises steps of 5–10°C and testing the bitumen against its specification before use. Always follow the product SDS and your site risk assessment; hot bitumen causes severe burns and water contact can cause boil-over.

4. Sampling and inspection

  • Agree where and how samples are taken (for example at loading under EN 58 or ASTM D140) and how many reference samples are sealed and retained.
  • Decide whether independent inspection at loading is needed. For bulk cargoes and large drum orders it is usually worth the cost.
  • Agree how a dispute will be settled: which laboratory, which sample, and what tolerance for test precision.

5. Documents and terms

  • Certificate of analysis for each batch, reporting every property in the standard's table.
  • Safety data sheet.
  • Certificate of origin if required by your customs.
  • Packing list, bill of lading and inspection report where applicable.

State the Incoterm (for example FOB, CFR or CIF), destination port, shipment window and payment terms. For bulk, agree how quantity is measured at loading and discharge.

The cheapest lot is the one that passes inspection at site. Put the standard, sampling and documents in writing before shipment.

After delivery. Keep the retained samples and the CoA together for at least the period over which a claim could arise. If a site test disagrees with the certificate, check the sampling point, the binder's temperature history since delivery and the test method before raising a claim. Record storage temperatures, and keep drums or bags from different batches apart so each lot can be traced. These simple records make it far easier to resolve a disagreement with a supplier or a client.

Sending the enquiry

Nuroil supplies penetration grade bitumen from established producers on FOB UAE terms, with CFR and CIF on request, a CoA with every delivery and inspection on request. Send the details above through request a quote and we will confirm availability against your specification.

PRODUCTS IN THIS GUIDE
KEEP READING

More from the Knowledge Centre.

STILL HAVE A QUESTION?

Ask the people who trade it every day.

Our trade managers answer technical and commercial questions about grades, specifications, packing and shipping.

LET’S TALK ABOUT YOUR REQUIREMENTS

Your next shipment starts here.

Request a quote